Melola Discovery

← Melola Discovery

Open access Jurnal SINTA 1

Single phase robustness variable structure load frequency controller for multi-region interconnected power systems with communication delays

International Journal of Electrical and Computer Engineering (IJECE) · Vol. 14 No. 5 (2024)

DOI
10.11591/ijece.v14i5.pp5064-5071
ISSN
2722-2578, 2088-8708
Published
2024-10-01
Publisher
Institute of Advanced Engineering and Science
License
creativecommons.org/licenses/by-sa/4.0

Abstract

This paper proposes an estimator-based single phase robustness variable structure load frequency controller (SPRVSLFC) for the multi-region interconnected power systems (MRIPS) with communication delays. The key attainments of this research consist of two missions: i) a global stability of the power systems is guaranteed by removing the reaching phase in traditional variable structure control (TVSC) technique; and ii) a novel output feedback load frequency controller is established based on the estimator tool and output information only. Initially, a single-phase switching function is constructed to disregard the reaching phase in TVSC. Then, an unmeasurable state variable of the MRIPS is estimated by using the proposed estimator tool. Next, a new SPRVSLFC for the MRIPS is suggested based on the support of the estimator tool and output data only. Furthermore, a sufficient constraint is constructed by retaining the linear matrix inequality (LMI) procedure for ensuring the robust stability of motion dynamics in sliding mode. Finally, the performance of interconnected power plant under changed multi-constraints is imitated with the novel control technique to validate the practicability of the plant.

Collaboration network of the authors

4 authors · 4 co-authorship links · 4 across different organisations

Hover or tap a name to highlight its co-authors. Double-click to open the author's page.

  • Ho Chi Minh City University of Technology and Engineering
  • Ton Duc Thang University
  • Ho Chi Minh City University of Industry and Trade
  • Van Lang University
  • Different organisations
  • Same organisation
  • Affiliation unknown
  • Thicker line = more joint articles · bigger circle = more articles
Show as table
Co-authorOrganisationJoint articles
Van-Duc PhanVan Lang University1
Chiem Trong HienHo Chi Minh City University of Industry and Trade1

Affiliations come from OpenAlex; journal OAI-PMH metadata carries none. Authors without an OpenAlex ID are matched by name, which can merge or split people.

This record comes from Crossref (what the publisher deposited), because the journal's own OAI-PMH endpoint could not be harvested.

Metadata source: Crossref API (cadangan, berdasarkan ISSN) https://api.crossref.org/journals/2088-8708/works, first harvested 27 Okt 2026, last seen 27 Okt 2026.
Metadata as oai_dc, converted from Crossref
<oai_dc:dc xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/"><dc:title>Single phase robustness variable structure load frequency controller for multi-region interconnected power systems with communication delays</dc:title><dc:creator>Nguyen, Phan-Thanh</dc:creator><dc:creator>Nguyen, Cong-Trang</dc:creator><dc:description>&lt;jats:p&gt;This paper proposes an estimator-based single phase robustness variable structure load frequency controller (SPRVSLFC) for the multi-region interconnected power systems (MRIPS) with communication delays. The key attainments of this research consist of two missions: i) a global stability of the power systems is guaranteed by removing the reaching phase in traditional variable structure control (TVSC) technique; and ii) a novel output feedback load frequency controller is established based on the estimator tool and output information only. Initially, a single-phase switching function is constructed to disregard the reaching phase in TVSC. Then, an unmeasurable state variable of the MRIPS is estimated by using the proposed estimator tool. Next, a new SPRVSLFC for the MRIPS is suggested based on the support of the estimator tool and output data only. Furthermore, a sufficient constraint is constructed by retaining the linear matrix inequality (LMI) procedure for ensuring the robust stability of motion dynamics in sliding mode. Finally, the performance of interconnected power plant under changed multi-constraints is imitated with the novel control technique to validate the practicability of the plant.&lt;/jats:p&gt;</dc:description><dc:publisher>Institute of Advanced Engineering and Science</dc:publisher><dc:date>2024-10-01</dc:date><dc:type>info:eu-repo/semantics/article</dc:type><dc:format>application/pdf</dc:format><dc:identifier>https://doi.org/10.11591/ijece.v14i5.pp5064-5071</dc:identifier><dc:identifier>10.11591/ijece.v14i5.pp5064-5071</dc:identifier><dc:source>International Journal of Electrical and Computer Engineering (IJECE); Vol 14 No 5 (2024); 5064</dc:source><dc:source>2722-2578</dc:source><dc:source>2088-8708</dc:source><dc:relation>https://ijece.iaescore.com/index.php/IJECE/article/viewFile/36339/17646</dc:relation><dc:rights>http://creativecommons.org/licenses/by-sa/4.0</dc:rights></oai_dc:dc>