Jurnal
Tanpa peringkat SINTA
Determination of Optimum Resources for the Blang Kejeren Electrical System Using PSS Sincal Application
Circuit: Jurnal Ilmiah Pendidikan Teknik Elektro · Vol. 8 No. 1 (2024) · hlm. 34–45
ISSN 2549-3701, 2549-3698
Terbit 2024-01-29
Penerbit PTE FTK UIN Ar-Raniry
Bahasa eng
Abstrak
Currently, the Customer Service Unit (ULP) of the Blang Kejeren State Power Company (PLN) uses the system of the Diesel Power Power Centre (PLTD). Sistem ini terdiri dari PLTD yang dimiliki PLN dan PLtD Lewa, serta beberapa PLTMH (Pusat Listrik Tenaga Mikro Hidro). Aim of the study is to assess the technical viability of the 20 kV ULP Blangkejeren system if supplied with the Kutacane GI and parallel with Distributed Generation (DG). This is because there is no distribution network that can connect the Blangkejeren ULP load centre to the Kutacane GI. Using the PSS Sincal Power System Analysis Application, load scenarios for power plants and distribution networks are modeled and simulated. The findings indicate that the 20kV Ulp Blangkjeren system provided by GI Kutacana, PLTMH, PLTM Lawe, and PLTD Rema is the most appropriate scenario. This situation is regarded as optimal, with a network voltage of 21.07 kV on the ULP Blangkejeren Connection Guard Bus.
Jaringan kolaborasi para penulis
9 penulis ·
12 tautan kepenulisan bersama
· 4 lintas organisasi
Arahkan kursor atau ketuk sebuah nama untuk menyorot rekan penulisnya. Klik dua kali untuk membuka halaman penulis.
Universitas Syiah Kuala Universitas Sultan Muhammad Syafiuddin Sambas Universitas Islam Negeri Ar-Raniry Afiliasi tidak diketahui
Organisasi berbeda
Organisasi sama
Afiliasi tidak diketahui
Garis lebih tebal = lebih banyak artikel bersama · lingkaran lebih besar = lebih banyak artikel
Tampilkan sebagai tabel
Afiliasi berasal dari OpenAlex; metadata OAI-PMH jurnal tidak memuatnya. Penulis tanpa ID OpenAlex dicocokkan berdasarkan nama, sehingga dua orang bisa tergabung atau satu orang bisa terpisah.
Sumber metadata: OAI-PMH (metadata jurnal) https://jurnal.ar-raniry.ac.id/index.php/circuit/oai, pertama di-harvest 6 Nov 2026, terakhir terlihat 16 Nov 2026.
Metadata asli (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
<dc:title xml:lang="en">Determination of Optimum Resources for the Blang Kejeren Electrical System Using PSS Sincal Application</dc:title>
<dc:creator xml:lang="en">Panggabean, Ulil Azmi</dc:creator>
<dc:creator xml:lang="en">Suriadi, Suriadi</dc:creator>
<dc:creator xml:lang="en">Lubis, Rakhmad Syafutra</dc:creator>
<dc:subject xml:lang="en">Isolated</dc:subject>
<dc:subject xml:lang="en">GI</dc:subject>
<dc:subject xml:lang="en">DG</dc:subject>
<dc:subject xml:lang="en">power flow</dc:subject>
<dc:subject xml:lang="en">PSS Sincal</dc:subject>
<dc:description xml:lang="en">Currently, the Customer Service Unit (ULP) of the Blang Kejeren State Power Company (PLN) uses the system of the Diesel Power Power Centre (PLTD). Sistem ini terdiri dari PLTD yang dimiliki PLN dan PLtD Lewa, serta beberapa PLTMH (Pusat Listrik Tenaga Mikro Hidro). Aim of the study is to assess the technical viability of the 20 kV ULP Blangkejeren system if supplied with the Kutacane GI and parallel with Distributed Generation (DG). This is because there is no distribution network that can connect the Blangkejeren ULP load centre to the Kutacane GI. Using the PSS Sincal Power System Analysis Application, load scenarios for power plants and distribution networks are modeled and simulated. The findings indicate that the 20kV Ulp Blangkjeren system provided by GI Kutacana, PLTMH, PLTM Lawe, and PLTD Rema is the most appropriate scenario. This situation is regarded as optimal, with a network voltage of 21.07 kV on the ULP Blangkejeren Connection Guard Bus. </dc:description>
<dc:publisher xml:lang="en">PTE FTK UIN Ar-Raniry</dc:publisher>
<dc:date>2024-01-29</dc:date>
<dc:type>info:eu-repo/semantics/article</dc:type>
<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
<dc:format>application/pdf</dc:format>
<dc:identifier>https://jurnal.ar-raniry.ac.id/index.php/circuit/article/view/19441</dc:identifier>
<dc:identifier>10.22373/crc.v8i1.19441</dc:identifier>
<dc:source xml:lang="en">Circuit: Jurnal Ilmiah Pendidikan Teknik Elektro; Vol. 8 No. 1 (2024); 34-45</dc:source>
<dc:source>2549-3701</dc:source>
<dc:source>2549-3698</dc:source>
<dc:language>eng</dc:language>
<dc:relation>https://jurnal.ar-raniry.ac.id/index.php/circuit/article/view/19441/9120</dc:relation>
<dc:rights xml:lang="en">Copyright (c) 2024 Ulil Azmi Panggabean, Suriadi, Rakhmad Syafutra Lubis</dc:rights>
</oai_dc:dc>
Sitasi dan pengindeksan
Jumlah menurut tiap indeks pada 13 Nov 2026; setiap indeks menghitung sitasi dengan cara berbeda.
OpenAlex juga mencatat karya ini di: crossref.
Sitasi artikel ini
APA 7
Panggabean, U. A., Suriadi, S., & Lubis, R. S. (2024). Determination of Optimum Resources for the Blang Kejeren Electrical System Using PSS Sincal Application. Circuit: Jurnal Ilmiah Pendidikan Teknik Elektro, 8(1), 34–45. https://doi.org/10.22373/crc.v8i1.19441
Salin
IEEE
U. A. Panggabean, S. Suriadi, and R. S. Lubis, “Determination of Optimum Resources for the Blang Kejeren Electrical System Using PSS Sincal Application,” Circuit: Jurnal Ilmiah Pendidikan Teknik Elektro, vol. 8, no. 1, pp. 34–45, 2024, doi: 10.22373/crc.v8i1.19441.
Salin
Dibuat dari metadata jurnal; periksa nama penulis sebelum dipakai.