Melola Discovery

← Melola Discovery

Journal SINTA 1

Estimation of Bank Erosion Due to Reservoir Operation in Cascade (Case Study: Citarum Cascade Reservoir)

Journal of Engineering and Technological Sciences · Vol. 41 No. 2 (2013) · pp. 148–166

DOI
10.5614/itbj.eng.sci.2009.41.2.5
ISSN
2338-5502, 2337-5779
Published
2013-09-13
Publisher
Directorate for Research and Community Services, Institut Teknologi Bandung
Language
eng

Abstract

Sedimentation is such a crucial issue to be noted once the accumulated sediment begins to fill the reservoir dead storage, this will then influence the long-term reservoir operation. The sediment accumulated requires a serious attention for it may influence the storage capacity and other reservoir management of activities. The continuous inflow of sediment to the reservoir will decrease the capacity of reservoir storage, the reservoir value in use, and the useful age of reservoir. Because of that, the rate of the sediment needs to be delayed as possible. In this research, the delay of the sediment rate is considered based on the rate of flow of landslide of the reservoir slope. The rate of flow of the sliding slope can be minimized by way of each reservoir autonomous efforts. This effort can be performed through; the regulation of fluctuating rate of reservoir surface current that does not cause suddenly drawdown and upraising as well. The research model is compiled using the searching technique of Non Linear Programming (NLP). The rate of bank erosion for the reservoir variates from 0.0009 to 0.0048 MCM/year, which is no sigrificant value to threaten the life time of reservoir.Mean while the rate of watershed sediment has a significant value, i.e: 3,02 MCM/year for Saguling that causes to fullfill the storage capacity in 40 next years (from years 2008).

Collaboration network of the authors

6 authors · 9 co-authorship links · 5 across different organisations

Hover or tap a name to highlight its co-authors. Double-click to open the author's page.

  • Universitas Muhammadiyah Aceh
  • Bandung Institute of Technology
  • Universitas Syiah Kuala
  • Different organisations
  • Same organisation
  • Affiliation unknown
  • Thicker line = more joint articles · bigger circle = more articles
Show as table
Co-authorOrganisationJoint articles
Hafnidar A. RaniUniversitas Muhammadiyah Aceh1
Firmansyah RachmanUniversitas Muhammadiyah Aceh1
Tasri SalamUniversitas Muhammadiyah Aceh1

Affiliations come from OpenAlex; journal OAI-PMH metadata carries none. Authors without an OpenAlex ID are matched by name, which can merge or split people.

Metadata source: OAI-PMH (metadata jurnal) https://journals.itb.ac.id/index.php/jets/oai, first harvested 9 Nov 2026, last seen 22 Nov 2026.
Original metadata (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/  http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
	<dc:title xml:lang="en-US">Estimation of Bank Erosion Due to Reservoir Operation in Cascade (Case Study: Citarum Cascade Reservoir)</dc:title>
	<dc:creator>Legowo, Sri</dc:creator>
	<dc:creator>Hadihardaja, Iwan K.</dc:creator>
	<dc:creator>Azmeri, Azmeri</dc:creator>
	<dc:description xml:lang="en-US">Sedimentation  is  such  a  crucial  issue  to  be  noted  once  the accumulated  sediment  begins  to  fill  the  reservoir  dead  storage,  this  will  then influence the long-term reservoir operation. The sediment accumulated requires a serious attention for it may influence the storage capacity and other reservoir management  of  activities.  The  continuous  inflow  of  sediment  to  the  reservoir will decrease the capacity of reservoir storage, the reservoir value in use, and the useful  age  of  reservoir.  Because  of  that,  the  rate  of  the  sediment  needs  to  be delayed as possible. In this research, the delay of the sediment rate is considered based on the rate of flow of landslide of the reservoir slope. The rate of flow of the sliding slope can be minimized by way of each reservoir autonomous efforts. This  effort  can  be  performed  through;  the  regulation  of  fluctuating  rate  of reservoir surface current that does not cause suddenly  drawdown  and upraising as well. The research model is compiled using the searching technique of Non Linear Programming (NLP). The  rate  of  bank  erosion  for  the  reservoir  variates  from  0.0009  to  0.0048 MCM/year, which is no sigrificant value to threaten the life time of reservoir.Mean  while  the   rate  of  watershed  sediment  has  a  significant  value,  i.e:  3,02  MCM/year  for  Saguling  that  causes  to  fullfill  the  storage  capacity  in  40  next years (from years 2008). </dc:description>
	<dc:publisher xml:lang="en-US">Directorate for Research and Community Services, Institut Teknologi Bandung</dc:publisher>
	<dc:date>2013-09-13</dc:date>
	<dc:type>info:eu-repo/semantics/article</dc:type>
	<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
	<dc:format>application/pdf</dc:format>
	<dc:identifier>https://journals.itb.ac.id/index.php/jets/article/view/123</dc:identifier>
	<dc:identifier>10.5614/itbj.eng.sci.2009.41.2.5</dc:identifier>
	<dc:source xml:lang="en-US">Journal of Engineering and Technological Sciences; Vol. 41 No. 2 (2009); 148-166</dc:source>
	<dc:source>2338-5502</dc:source>
	<dc:source>2337-5779</dc:source>
	<dc:language>eng</dc:language>
	<dc:relation>https://journals.itb.ac.id/index.php/jets/article/view/123/119</dc:relation>
</oai_dc:dc>