Open access
Journal
SINTA 1
Reducing waiting and idle time for a group of jobs in the grid computing
Bulletin of Electrical Engineering and Informatics · Vol. 12 No. 5 (2023) · pp. 3115–3123
ISSN 2089-3191, 2302-9285
Published 2023-10-01
Publisher Institute of Advanced Engineering and Science (IAES)
Language en
Abstract
Johnson's rule is a scheduling method for the sequence of jobs. Its primary goal is to find the perfect sequence of functions to reduce the amount of idle time, and it also reduces the total time required to complete all functions. It is a suitable method for scheduling the purposes of two functions in a specific time-dependent sequence for both functions and where the time factor is the only parameter used in this way. Therefore, it is not suitable for scheduling work for computers network, where there are many factors affecting the completion time such as CPU speed, memory, bandwidth, and size of data. In this research, Johnson's method will adopt by adding many factors that affect the completion time of the work so that it becomes suitable for the site’s job scheduling purposes to reduce the waiting and idle time for a group of jobs.
Collaboration network of the authors
4 authors ·
6 co-authorship links
· 3 across different organisations
Hover or tap a name to highlight its co-authors. Double-click to open the author's page.
University of Babylon Al-Zahraa University for Women
Different organisations
Same organisation
Affiliation unknown
Thicker line = more joint articles · bigger circle = more articles
Show as table
Affiliations come from OpenAlex; journal OAI-PMH metadata carries none. Authors without an OpenAlex ID are matched by name, which can merge or split people.
Metadata source: OpenAlex API (jurnal SINTA, ADR 0048) https://openalex.org/S2765016208, first harvested 22 Nov 2026, last seen 22 Nov 2026.
Original metadata (oai_dc)
<oai_dc:dc xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/"><dc:title xml:lang="en">Reducing waiting and idle time for a group of jobs in the grid computing</dc:title><dc:creator>Mahdi S. Almhanna</dc:creator><dc:creator>Firas Sabah Al-Turaihi</dc:creator><dc:creator>Tariq A. Murshedi</dc:creator><dc:subject>job scheduling</dc:subject><dc:subject>grid computing</dc:subject><dc:subject>Johnson's rule</dc:subject><dc:subject>waiting time</dc:subject><dc:subject>idle time</dc:subject><dc:subject>completion time</dc:subject><dc:subject>multi-criteria scheduling</dc:subject><dc:subject>memory</dc:subject><dc:subject>bandwidth</dc:subject><dc:subject>dataset size</dc:subject><dc:description xml:lang="en">Johnson's rule is a scheduling method for the sequence of jobs. Its primary goal is to find the perfect sequence of functions to reduce the amount of idle time, and it also reduces the total time required to complete all functions. It is a suitable method for scheduling the purposes of two functions in a specific time-dependent sequence for both functions and where the time factor is the only parameter used in this way. Therefore, it is not suitable for scheduling work for computers network, where there are many factors affecting the completion time such as CPU speed, memory, bandwidth, and size of data. In this research, Johnson's method will adopt by adding many factors that affect the completion time of the work so that it becomes suitable for the site’s job scheduling purposes to reduce the waiting and idle time for a group of jobs.</dc:description><dc:publisher>Institute of Advanced Engineering and Science (IAES)</dc:publisher><dc:date>2023-10-01</dc:date><dc:type>info:eu-repo/semantics/article</dc:type><dc:format>application/pdf</dc:format><dc:identifier>https://doi.org/10.11591/eei.v12i5.4729</dc:identifier><dc:identifier>10.11591/eei.v12i5.4729</dc:identifier><dc:source>Bulletin of Electrical Engineering and Informatics; Vol 12 No 5 (2023); 3115-3123</dc:source><dc:source>2089-3191</dc:source><dc:source>2302-9285</dc:source><dc:language>en</dc:language><dc:relation>https://doi.org/10.11591/eei.v12i5.4729</dc:relation><dc:rights>https://creativecommons.org/licenses/by-sa/4.0/</dc:rights></oai_dc:dc>
Citations and indexing
OpenAlex
Indexed
via ID karya OpenAlex (record dari sumber OpenAlex)
9 citations
Crossref
Indexed
via DOI
3 citations
Counts as reported by each index on 19 Nov 2026; indexes count citations differently.
OpenAlex also lists this work in: crossref.
Cite this article
APA 7
Almhanna, M. S., Al-Turaihi, F. S., & Murshedi, T. A. (2023). Reducing waiting and idle time for a group of jobs in the grid computing. Bulletin of Electrical Engineering and Informatics, 12(5), 3115–3123. https://doi.org/10.11591/eei.v12i5.4729
Copy
IEEE
M. S. Almhanna, F. S. Al-Turaihi, and T. A. Murshedi, “Reducing waiting and idle time for a group of jobs in the grid computing,” Bulletin of Electrical Engineering and Informatics, vol. 12, no. 5, pp. 3115–3123, 2023, doi: 10.11591/eei.v12i5.4729.
Copy
Generated from the journal's metadata; check author names before use.