Melola Discovery

← Melola Discovery

Journal SINTA 3

Analysis of OHS Costs in the Road Construction Project of Singaraja City – Mengwi (Short Cut Bedugul Point 5 - 6)

Logic: Jurnal Rancang Bangun dan Teknologi · Vol. 21 No. 2 (2021) · pp. 97–100

DOI
10.31940/logic.v21i2.2545
ISSN
2580-5649, 1412-114X
Published
2021-07-30
Publisher
Pusat Penelitian dan Pengabdian kepada Masyarakat (P3M) Politeknik Negeri Bali
Language
eng

Abstract

Short Cut Bedugul is a short road construction project on the Singaraja-Denpasar route. The short cut development includes the implementation of an occupational health and safety management system (SMK3). The 5-6 point short cut project includes the grade of a large project and places great importance on work safety. Field conditions with high rainfall make the area prone to landslides that can endanger workers, as well as environmental temperatures that reach 20oC which can affect work productivity. The objectives of this study are: To analyze the implementation of occupational safety and health (K3) on the Short Cut project point 5-6 Bedugul. To find out the amount of costs incurred in implementing K3 on the Short Cut point 5-6 Bedugul project. To analyze the percentage of safety and health costs (K3) to the short cut project value point 5-6 Bedugul. The type of research used in this research is descriptive research. and a quantitative descriptive of the construction of the Singaraja City Boundary Road - Mengwi (Short Cut Bedugul point 5–6) the use of K3 such as the use of safety helmets, light vests, masks, gloves, and safety belts is in accordance with the law and is very disciplined and obedient to existing regulations. set. The percentage of K3 costs to the project value refers to the CIRCULAR OF THE MINISTER NO. 66 / SE / M / 2015 Regarding the Cost of Implementing an Occupational Safety and Health Management System (SMK3) Construction in the Public Works Sector is 0.7%.

Collaboration network of the authors

24 authors · 53 co-authorship links

Hover or tap a name to highlight its co-authors. Double-click to open the author's page.

  • Politeknik Negeri Bali
  • Affiliation unknown
  • Different organisations
  • Same organisation
  • Affiliation unknown
  • Thicker line = more joint articles · bigger circle = more articles
Show as table
Co-authorOrganisationJoint articles
I Nengah Darma SusilaPoliteknik Negeri Bali4
I Made BudiadiAffiliation unknown3
I Made SudiarsaPoliteknik Negeri Bali2
Ida Bagus WirahajiPoliteknik Negeri Bali2
I Made Anom SantianaPoliteknik Negeri Bali2
I Gede Sastra WibawaPoliteknik Negeri Bali2
I Made TapayasaPoliteknik Negeri Bali2
I Wayan SuasiraPoliteknik Negeri Bali2
I Nyoman ArdikaPoliteknik Negeri Bali2
I Putu Agus KrisnadinataPoliteknik Negeri Bali2
I Komang SudiartaPoliteknik Negeri Bali2
I Nyoman SutarnaPoliteknik Negeri Bali1
I Nyoman SuardikaPoliteknik Negeri Bali1
Kadek Adi SuryawanPoliteknik Negeri Bali1
I Made Suardana KaderPoliteknik Negeri Bali1
I Ketut Astawa BagiaAffiliation unknown1
Made SudiarsaPoliteknik Negeri Bali1
I Ketut Gede I Ketut GedeAffiliation unknown1
I Ketut Gede BandesaAffiliation unknown1

Affiliations come from OpenAlex; journal OAI-PMH metadata carries none. Authors without an OpenAlex ID are matched by name, which can merge or split people.

Metadata source: OAI-PMH (metadata jurnal) https://ojs.pnb.ac.id/index.php/LOGIC/oai, first harvested 19 Nov 2026, last seen 19 Nov 2026.
Original metadata (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/  http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
	<dc:title xml:lang="en-US">Analysis of OHS Costs in the Road Construction Project of Singaraja City – Mengwi (Short Cut Bedugul Point 5 - 6)</dc:title>
	<dc:creator>Sutapa, I Ketut</dc:creator>
	<dc:creator>Sutapa, I Nyoman</dc:creator>
	<dc:creator>Suparta, I Wayan Darya</dc:creator>
	<dc:creator>Ramia, I Nyoman</dc:creator>
	<dc:creator>Tuhujati, Denin Lintang</dc:creator>
	<dc:description xml:lang="en-US">Short Cut Bedugul is a short road construction project on the Singaraja-Denpasar route. The short cut development includes the implementation of an occupational health and safety management system (SMK3). The 5-6 point short cut project includes the grade of a large project and places great importance on work safety. Field conditions with high rainfall make the area prone to landslides that can endanger workers, as well as environmental temperatures that reach 20oC which can affect work productivity. The objectives of this study are: To analyze the implementation of occupational safety and health (K3) on the Short Cut project point 5-6 Bedugul. To find out the amount of costs incurred in implementing K3 on the Short Cut point 5-6 Bedugul project. To analyze the percentage of safety and health costs (K3) to the short cut project value point 5-6 Bedugul. The type of research used in this research is descriptive research. and a quantitative descriptive of the construction of the Singaraja City Boundary Road - Mengwi (Short Cut Bedugul point 5–6) the use of K3 such as the use of safety helmets, light vests, masks, gloves, and safety belts is in accordance with the law and is very disciplined and obedient to existing regulations. set. The percentage of K3 costs to the project value refers to the CIRCULAR OF THE MINISTER NO. 66 / SE / M / 2015 Regarding the Cost of Implementing an Occupational Safety and Health Management System (SMK3) Construction in the Public Works Sector is 0.7%.</dc:description>
	<dc:publisher xml:lang="en-US">Pusat Penelitian dan Pengabdian kepada Masyarakat (P3M) Politeknik Negeri Bali</dc:publisher>
	<dc:date>2021-07-30</dc:date>
	<dc:type>info:eu-repo/semantics/article</dc:type>
	<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
	<dc:type xml:lang="en-US">Peer-reviewed Article</dc:type>
	<dc:format>application/pdf</dc:format>
	<dc:identifier>https://ojs.pnb.ac.id/index.php/LOGIC/article/view/2545</dc:identifier>
	<dc:identifier>10.31940/logic.v21i2.2545</dc:identifier>
	<dc:source xml:lang="en-US">Logic : Jurnal Rancang Bangun dan Teknologi; Vol 21 No 2 (2021): July; 97-100</dc:source>
	<dc:source>2580-5649</dc:source>
	<dc:source>1412-114X</dc:source>
	<dc:source>10.31940/logic.v21i2</dc:source>
	<dc:language>eng</dc:language>
	<dc:relation>https://ojs.pnb.ac.id/index.php/LOGIC/article/view/2545/1822</dc:relation>
	<dc:rights xml:lang="en-US">Copyright (c) 2021 Logic : Jurnal Rancang Bangun dan Teknologi</dc:rights>
</oai_dc:dc>