Pusat Penelitian dan Pengabdian kepada Masyarakat (P3M) Politeknik Negeri Bali
Language
eng
Abstract
Abstract. The Bulusan landfill of Banyuwangi has 1.5 ha to accommodate garbage from 13 districts with an input of 451.8 m3 of garbage per day and controlled landfill methods are carried out as garbage management. This research aims to evaluate the capacity of the Bulusan Landfill in Banyuwangi. Arithmetic, geometric and least square method were selected by the highest correlation value. The projection result of the Bulusan landfill for 2018 has been declared overloaded, with the height of embankment was higher than the planned embankment and it has not been able to accommodate garbage. The projection for the next 15 years from 2017 to 2031 was predicted that Bulusan landfill will be overloaded at 1.172.185 m3 of garbage volume. Financial and technical feasibility studies for candidates for the Bulusan landfill replacement need to be carried out so that the Bulusan landfill replacement project can be realized immediately.
Collaboration network of the authors
16 authors ·
28 co-authorship links
Hover or tap a name to highlight its co-authors. Double-click to open the author's page.
Politeknik Negeri Banyuwangi
Affiliation unknown
Different organisations
Same organisation
Affiliation unknown
Thicker line = more joint articles · bigger circle = more articles
Affiliations come from OpenAlex; journal OAI-PMH metadata carries none. Authors without an OpenAlex ID are matched by name, which can merge or split people.