Evaluasi Kestabilan Peralihan Mesin Tunggal dengan Metode Rungge Kutta Orde 4 (Studi Kasus: Sistem Kelistrikan Sumatera)

Jurnal Nasional Teknik Elektro · Vol. 3 No. 1 (2014) · pp. 89–89

DOI
10.25077/jnte.v3n1.59.2014
ISSN
2302-2949, 2407-7267
Published
2014-03-01
Publisher
Andalas University
Language
id
License
creativecommons.org/licenses/by-nc-sa/4.0/

Abstract

The journal discusses the evaluation and calculation of the termination time of the critical electrical system stability studies Sumatra through the transient stability by using the Runge-Kutta method Order 4. For this type of disorder transition used is a three-phase symmetrical disorder with the help of MATLAB software. The calculation result shows that the value of the smallest critical time termination occurs between PLTGU Belawan - GI Ombilin Binjai and power plant - GI Batusangkat at 0:24 seconds. While the most critical time of termination occurs at a power plant Pauh Limo - GI Indarung at 1:14 seconds.Keywords: Stabilitas peralihan, runge – kutta orde 4, waktu kritis pemutusan. AbstrakJurnal ini membahas tentang evaluasi dan perhitungan waktu pemutusan kritis dari sistem kelistrikan Sumatera melalui studi kestabilan peralihan dengan menggunakan metoda Runge-Kutta Orde 4. Untuk jenis gangguan peralihan yang digunakan adalah gangguan tiga fasa simetris dengan bantuan perangkat lunak Matlab. Hasil perhitungan diperoleh bahwa nilai waktu pemutusan kritis terkecil terjadi antara PLTGU Belawan – GI Binjai dan PLTU Ombilin – GI Batusangkat sebesar 0.24 detik. Sedangkan waktu pemutusan kritis terbesar terjadi pada PLTG Pauh Limo – GI Indarung sebesar 1.14 detik.Kata Kunci: Stabilitas peralihan, runge – kutta orde 4, waktu kritis pemutusan

Keywords

Collaboration network of the authors

25 authors · 51 co-authorship links · 18 across different organisations

Hover or tap a name to highlight its co-authors. Double-click to open the author's page.

  • Andalas University
  • University of Bengkulu
  • Universitas Ekasakti
  • Universitas PGRI Sumatera Barat
  • Affiliation unknown
  • Different organisations
  • Same organisation
  • Affiliation unknown
  • Thicker line = more joint articles · bigger circle = more articles
Show as table
Co-authorOrganisationJoint articles
Noris Fredi YuliantoAffiliation unknown2
Wayu Diafridho AAndalas University2
Aidil DanasUniversitas Ekasakti2
Syafii SyafiiAndalas University1
Muhardika MuhardikaAndalas University1
Adry FebriandaAndalas University1
Syukri YunusAndalas University1
Putri NidyaAndalas University1
MazuesAndalas University1
. .Affiliation unknown1
Novizon NovizonAndalas University1
N RiskaAndalas University1
Doohan HalimanAndalas University1
Syafi’iAndalas University1
Muhammad Reza PermanaAndalas University1
Firmansyah SaputraAndalas University1
Ismail IsmailAndalas University1
Fitrilina FitrilinaUniversity of Bengkulu1
Melda LatifAndalas University1
Alex SurapatiUniversity of Bengkulu1
GaneshaUniversity of Bengkulu1
Yanolanda Suzantry HandayaniUniversity of Bengkulu1
Rahayu Trisetyowati UntariUniversitas PGRI Sumatera Barat1

Affiliations come from OpenAlex; journal OAI-PMH metadata carries none. Authors without an OpenAlex ID are matched by name, which can merge or split people.

Metadata source: OpenAlex API (jurnal SINTA, ADR 0048) https://openalex.org/S4210175326, first harvested 20 Nov 2026, last seen 20 Nov 2026.
Original metadata (oai_dc)
<oai_dc:dc xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/"><dc:title xml:lang="id">Evaluasi Kestabilan Peralihan Mesin Tunggal dengan Metode Rungge Kutta Orde 4 (Studi Kasus : Sistem Kelistrikan Sumatera)</dc:title><dc:creator>Heru Dibyo Laksono</dc:creator><dc:creator>Alrino Rizki Ramadhan</dc:creator><dc:subject>transient stability</dc:subject><dc:subject>critical clearing time</dc:subject><dc:subject>single machine infinite bus</dc:subject><dc:subject>power system stability</dc:subject><dc:description xml:lang="id">The journal discusses the evaluation and calculation of the termination time of the critical electrical system stability studies Sumatra through the transient stability by using the Runge-Kutta method Order 4. For this type of disorder transition used is a three-phase symmetrical disorder with the help of MATLAB software. The calculation result shows that the value of the smallest critical time termination occurs between PLTGU Belawan - GI Ombilin Binjai and power plant - GI Batusangkat at 0:24 seconds. While the most critical time of termination occurs at a power plant Pauh Limo - GI Indarung at 1:14 seconds.Keywords : Stabilitas peralihan, runge – kutta orde 4, waktu kritis pemutusan . AbstrakJurnal ini membahas tentang evaluasi dan perhitungan waktu pemutusan kritis dari sistem kelistrikan Sumatera melalui studi kestabilan peralihan dengan menggunakan metoda Runge-Kutta Orde 4. Untuk jenis gangguan peralihan yang digunakan adalah gangguan tiga fasa simetris dengan bantuan perangkat lunak Matlab. Hasil perhitungan diperoleh bahwa nilai waktu pemutusan kritis terkecil terjadi antara PLTGU Belawan – GI Binjai dan PLTU Ombilin – GI Batusangkat sebesar 0.24 detik. Sedangkan waktu pemutusan kritis terbesar terjadi pada PLTG Pauh Limo – GI Indarung sebesar 1.14 detik.Kata Kunci : Stabilitas peralihan, runge – kutta orde 4, waktu kritis pemutusan</dc:description><dc:publisher>Andalas University</dc:publisher><dc:date>2014-03-01</dc:date><dc:type>info:eu-repo/semantics/article</dc:type><dc:format>application/pdf</dc:format><dc:identifier>https://doi.org/10.25077/jnte.v3n1.59.2014</dc:identifier><dc:identifier>10.25077/jnte.v3n1.59.2014</dc:identifier><dc:source>Jurnal Nasional Teknik Elektro; Vol 3 No 1 (2014); 89-89</dc:source><dc:source>2302-2949</dc:source><dc:source>2407-7267</dc:source><dc:language>id</dc:language><dc:relation>http://jnte.ft.unand.ac.id/index.php/jnte/article/download/59/56</dc:relation><dc:rights>https://creativecommons.org/licenses/by-nc-sa/4.0/</dc:rights></oai_dc:dc>