Melola Discovery

← Melola Discovery

Open access Journal SINTA 3

INTEGRATED FORECASTING AND AGGREGATE PLANNING FOR PRODUCTION OPTIMIZATION: A COMPARATIVE ANALYSIS OF OVERTIME AND SUBCONTRACTING CONTROLS

BAREKENG: Jurnal Ilmu Matematika dan Terapan · Vol. 18 No. 4 (2024) · pp. 2263–2272

DOI
10.30598/barekengvol18iss4pp2263-2272
ISSN
2615-3017, 1978-7227
Published
2024-10-11
Publisher
PATTIMURA UNIVERSITY
Language
eng
License
creativecommons.org/licenses/by-sa/4.0

Abstract

The current potential market demand with ever-changing situations and conditions must be managed properly to find out the potential market demand in the future. Rumah Warna Yogyakarta is one of the manufacturing industry players that has experienced fluctuations in market demand, even tending to decline from the end of 2021 to mid-2022. Data was obtained from the database and direct interviews with Rumah Warna in Yogyakarta from November 2021 to November 2022. This study aims to determine the prediction of product demand for Rumah Warna Yogyakarta in the next period, so that companies can carry out production planning strategies to minimize production cost. Product demand prediction is carried out using the Grey System method of the GM (1,1) model. Then proceed with the heuristic aggregate planning method that focuses on overtime control and subcontracting control. Based on the results of the analysis, the Grey System GM (1,1) method produces good prediction accuracy of 9.231%. The best aggregate planning method is the overtime control where Rumah Warna Yogyakarta can reduce costs by Rp 351,258,758 when compared to the subcontracting control method.

Collaboration network of the authors

11 authors · 46 co-authorship links · 41 across different organisations

Hover or tap a name to highlight its co-authors. Double-click to open the author's page.

  • Islamic University of Indonesia
  • State University of Semarang
  • Diponegoro University
  • Tarumanagara University
  • INTI International University
  • Universiti Malaysia Pahang Al-Sultan Abdullah
  • Universiti Teknikal Malaysia Melaka
  • Different organisations
  • Same organisation
  • Affiliation unknown
  • Thicker line = more joint articles · bigger circle = more articles
Show as table
Co-authorOrganisationJoint articles
Rahmat Doni WidodoState University of Semarang1
Deni Fajar FitriyanaState University of Semarang1
Januar Parlaungan SiregarUniversiti Malaysia Pahang Al-Sultan Abdullah1
Tezara CionitaINTI International University1
Rifky IsmailDiponegoro University1
Muhammad KhafidhIslamic University of Indonesia1
Finny Pratama PuteraIslamic University of Indonesia1
Agustinus Purna IrawanTarumanagara University1
Nur Hidayah IsmailUniversiti Teknikal Malaysia Melaka1

Affiliations come from OpenAlex; journal OAI-PMH metadata carries none. Authors without an OpenAlex ID are matched by name, which can merge or split people.

Metadata source: OAI-PMH (metadata jurnal) https://ojs3.unpatti.ac.id/index.php/barekeng/oai, first harvested 5 Nov 2026, last seen 22 Nov 2026.
Original metadata (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/  http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
	<dc:title xml:lang="en-US">INTEGRATED FORECASTING AND AGGREGATE PLANNING FOR PRODUCTION OPTIMIZATION: A COMPARATIVE ANALYSIS OF OVERTIME AND SUBCONTRACTING CONTROLS</dc:title>
	<dc:creator>Anindita, Sukma</dc:creator>
	<dc:creator>Yotenka, Rahmadi</dc:creator>
	<dc:description xml:lang="en-US">The current potential market demand with ever-changing situations and conditions must be managed properly to find out the potential market demand in the future. Rumah Warna Yogyakarta is one of the manufacturing industry players that has experienced fluctuations in market demand, even tending to decline from the end of 2021 to mid-2022. Data was obtained from the database and direct interviews with Rumah Warna in Yogyakarta from November 2021 to November 2022. This study aims to determine the prediction of product demand for Rumah Warna Yogyakarta in the next period, so that companies can carry out production planning strategies to minimize production cost. Product demand prediction is carried out using the Grey System method of the GM (1,1) model. Then proceed with the heuristic aggregate planning method that focuses on overtime control and subcontracting control. Based on the results of the analysis, the Grey System GM (1,1) method produces good prediction accuracy of 9.231%. The best aggregate planning method is the overtime control where Rumah Warna Yogyakarta can reduce costs by Rp 351,258,758 when compared to the subcontracting control method.</dc:description>
	<dc:publisher xml:lang="en-US">PATTIMURA UNIVERSITY</dc:publisher>
	<dc:date>2024-10-11</dc:date>
	<dc:type>info:eu-repo/semantics/article</dc:type>
	<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
	<dc:format>application/pdf</dc:format>
	<dc:identifier>https://ojs3.unpatti.ac.id/index.php/barekeng/article/view/12427</dc:identifier>
	<dc:identifier>10.30598/barekengvol18iss4pp2263-2272</dc:identifier>
	<dc:source xml:lang="en-US">BAREKENG: Jurnal Ilmu Matematika dan Terapan; Vol 18 No 4 (2024): BAREKENG: Journal of Mathematics and Its Application; 2263-2272</dc:source>
	<dc:source>2615-3017</dc:source>
	<dc:source>1978-7227</dc:source>
	<dc:source>10.30598/barekengvol18iss4year2024</dc:source>
	<dc:language>eng</dc:language>
	<dc:relation>https://ojs3.unpatti.ac.id/index.php/barekeng/article/view/12427/8845</dc:relation>
	<dc:rights xml:lang="en-US">Copyright (c) 2024 Sukma Anindita, Rahmadi Yotenka</dc:rights>
	<dc:rights xml:lang="en-US">http://creativecommons.org/licenses/by-sa/4.0</dc:rights>
</oai_dc:dc>