Melola Discovery

← Melola Discovery

Open access Journal SINTA 1

Goal Model to Business Process Model: A Methodology for Enterprise Government Tourism System Development

International Journal of Electrical and Computer Engineering (IJECE) · Vol. 6 No. 6 (2016)

DOI
10.11591/ijece.v6i6.pp3031-3036
ISSN
2088-8708, 2088-8708
Published
2016-12-01
Publisher
Institute of Advanced Engineering and Science
License
creativecommons.org/licenses/by-nc/4.0

Abstract

The critcal factor in successfully in system development is the requirement phase. The requirement should meets with its purpose. In order to achieve it, the methodology for requrement analysis is needed. Nowdays, the complexity of e-governemnt applications is grown significantly in the government environment. E-government applications should be developed based on regulations in order to achieve the goal model of government entitties. However, the goal model could not used directly to make business process model. In order to solve this problem,this paper presents and proposed a Methodology to extract goal model into business process model that called GBPM Methodology. It can support the requirement analysis phase, especially in enterprise government tourism system. This methodology consists of two methods, there are (1) Method for convert goal model to business use case diagram, (2) Method for convert business use case diagram to activity diagram. We do the experiment in e-government applications domain. This methodology suitable with enterprise government tourism system development.

Collaboration network of the authors

7 authors · 12 co-authorship links · 10 across different organisations

Hover or tap a name to highlight its co-authors. Double-click to open the author's page.

  • Binus University
  • Sunan Kalijaga State Islamic University Yogyakarta
  • Universitas Syiah Kuala
  • Universiti Teknologi MARA
  • Yarsi University
  • Affiliation unknown
  • Different organisations
  • Same organisation
  • Affiliation unknown
  • Thicker line = more joint articles · bigger circle = more articles
Show as table
Co-authorOrganisationJoint articles
Nilo LegowoBinus University1
Ahmad Fathul MaarifSunan Kalijaga State Islamic University Yogyakarta1
Nurul HudaYarsi University1
Darmawan DarmawanUniversitas Syiah Kuala1
Siti Nor Amira MohamadUniversiti Teknologi MARA1

Affiliations come from OpenAlex; journal OAI-PMH metadata carries none. Authors without an OpenAlex ID are matched by name, which can merge or split people.

This record comes from Crossref (what the publisher deposited), because the journal's own OAI-PMH endpoint could not be harvested.

Metadata source: Crossref API (cadangan, berdasarkan ISSN) https://api.crossref.org/journals/2088-8708/works, first harvested 27 Oct 2026, last seen 15 Nov 2026.
Metadata as oai_dc, converted from Crossref
<oai_dc:dc xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/"><dc:title>Goal Model to Business Process Model: A Methodology for Enterprise Government Tourism System Development</dc:title><dc:creator>Fajar, Ahmad Nurul</dc:creator><dc:creator>Shofi, Imam Marzuki</dc:creator><dc:description>&lt;jats:p&gt;&amp;lt;p&amp;gt;The critcal factor in successfully in system development is the requirement phase. The requirement should meets with its purpose. In order to achieve it, the methodology for requrement analysis is needed. Nowdays, the complexity of e-governemnt applications is grown significantly in the government environment. E-government applications should be developed based on regulations in order to achieve the goal model of government entitties. However, the goal model could not used directly to make business process model. In order to solve this problem,this paper presents and proposed a Methodology to extract goal model into business process model that called GBPM Methodology. It can support the requirement analysis phase, especially in enterprise government tourism system. This methodology consists of two methods, there are (1) Method for convert goal model to business use case diagram, (2) Method for convert business use case diagram to activity diagram. We do the experiment in e-government applications domain. This methodology suitable with enterprise government tourism system development.&amp;lt;/p&amp;gt;&lt;/jats:p&gt;</dc:description><dc:publisher>Institute of Advanced Engineering and Science</dc:publisher><dc:date>2016-12-01</dc:date><dc:type>info:eu-repo/semantics/article</dc:type><dc:format>application/pdf</dc:format><dc:identifier>https://doi.org/10.11591/ijece.v6i6.pp3031-3036</dc:identifier><dc:identifier>10.11591/ijece.v6i6.pp3031-3036</dc:identifier><dc:source>International Journal of Electrical and Computer Engineering (IJECE); Vol 6 No 6 (2016); 3031</dc:source><dc:source>2088-8708</dc:source><dc:source>2088-8708</dc:source><dc:relation>http://ijece.iaescore.com/index.php/IJECE/article/viewFile/5920/5582</dc:relation><dc:rights>http://creativecommons.org/licenses/by-nc/4.0</dc:rights></oai_dc:dc>