Journal
No SINTA rank
Analysis of Delays in the Handover of Infrastructure, Facilities, and Utilities by Housing Developers in the City of Semarang
Semarang State University Undergraduate Law and Society Review · Vol. 5 No. 1 (2025) · pp. 418–441
ISSN 2807-8683, 2807-8225
Published 2025-01-30
Publisher Faculty of Law, Universitas Negeri Semarang
Language eng
Abstract
The handover of infrastructure, facilities, and utilities (PSU) by housing developers must be carried out on time in accordance with Law Number 1 of 2011. In the City of Semarang, the PSU handover is specifically regulated under Law Number 7 of 2021. In practice, however, the handover of PSU is often delayed by housing developers. This delay causes confusion for the government when attempting to manage PSU within a housing complex, as full control remains with the developer. This study analyzes the factors behind the delays in PSU handovers by housing developers in the City of Semarang, as well as the resulting impacts on developers, residential environments, and homeowners. The findings indicate that the causes of delays can be categorized into internal factors—such as the developer’s ongoing interests in a housing area—and external factors—such as the unavailability of regional budget (APBD) funds from the government to manage the PSU
Collaboration network of the authors
No co-authors found in Melola yet.
Metadata source: OAI-PMH (metadata jurnal) https://journal.unnes.ac.id/journals/lsr/oai, first harvested 6 Nov 2026, last seen 22 Nov 2026.
Original metadata (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
<dc:title xml:lang="en">Analysis of Delays in the Handover of Infrastructure, Facilities, and Utilities by Housing Developers in the City of Semarang</dc:title>
<dc:creator xml:lang="en">Aurellia Sabryna Imanda</dc:creator>
<dc:subject xml:lang="en">Delay in the Handover of PSU</dc:subject>
<dc:subject xml:lang="en">Infrastructure</dc:subject>
<dc:subject xml:lang="en">Fasilities</dc:subject>
<dc:subject xml:lang="en">Utilities</dc:subject>
<dc:subject xml:lang="en">Housing Developer</dc:subject>
<dc:description xml:lang="en">The handover of infrastructure, facilities, and utilities (PSU) by housing developers must be carried out on time in accordance with Law Number 1 of 2011. In the City of Semarang, the PSU handover is specifically regulated under Law Number 7 of 2021. In practice, however, the handover of PSU is often delayed by housing developers. This delay causes confusion for the government when attempting to manage PSU within a housing complex, as full control remains with the developer. This study analyzes the factors behind the delays in PSU handovers by housing developers in the City of Semarang, as well as the resulting impacts on developers, residential environments, and homeowners. The findings indicate that the causes of delays can be categorized into internal factors—such as the developer’s ongoing interests in a housing area—and external factors—such as the unavailability of regional budget (APBD) funds from the government to manage the PSU</dc:description>
<dc:publisher xml:lang="en">Faculty of Law, Universitas Negeri Semarang</dc:publisher>
<dc:date>2025-01-30</dc:date>
<dc:type>info:eu-repo/semantics/article</dc:type>
<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
<dc:format>application/pdf</dc:format>
<dc:identifier>https://journal.unnes.ac.id/journals/lsr/article/view/24681</dc:identifier>
<dc:identifier>10.15294/lsr.v5i1.24681</dc:identifier>
<dc:source xml:lang="en">Semarang State University Undergraduate Law and Society Review; Vol. 5 No. 1 (2025): January-June, 2025; 418-441</dc:source>
<dc:source>2807-8683</dc:source>
<dc:source>2807-8225</dc:source>
<dc:source>10.15294/lsr.v5i1</dc:source>
<dc:language>eng</dc:language>
<dc:relation>https://journal.unnes.ac.id/journals/lsr/article/view/24681/4623</dc:relation>
<dc:rights xml:lang="en">Copyright (c) 2025 Semarang State University Undergraduate Law and Society Review</dc:rights>
</oai_dc:dc>
Citations and indexing
OpenAlex
Indexed
via DOI
1 citation
Crossref
Not found
Counts as reported by each index on 13 Nov 2026; indexes count citations differently.
OpenAlex also lists this work in: doaj.
Cite this article
APA 7
Imanda, A. S. (2025). Analysis of Delays in the Handover of Infrastructure, Facilities, and Utilities by Housing Developers in the City of Semarang. Semarang State University Undergraduate Law and Society Review, 5(1), 418–441. https://doi.org/10.15294/lsr.v5i1.24681
Copy
IEEE
A. S. Imanda, “Analysis of Delays in the Handover of Infrastructure, Facilities, and Utilities by Housing Developers in the City of Semarang,” Semarang State University Undergraduate Law and Society Review, vol. 5, no. 1, pp. 418–441, 2025, doi: 10.15294/lsr.v5i1.24681.
Copy
Generated from the journal's metadata; check author names before use.