Journal
No SINTA rank
Land Acquisition Regarding Agency Land: Construction Of The Bawen-Jogja Toll Road On SMKN 1 Bawen Agricultural Land
Semarang State University Undergraduate Law and Society Review · Vol. 5 No. 2 (2025) · pp. 1638–1659
ISSN 2807-8683, 2807-8225
Published 2025-07-21
Publisher Faculty of Law, Universitas Negeri Semarang
Language eng
Abstract
The construction of the Bawen-Jogja Toll Road has caused problems in the acquisition of agricultural land of SMK Negeri 1 Bawen covering an area of 1,752 m2, which is constrained by land ownership status. The complicated administrative process slows down the settlement of compensation. The purpose of this article is to analyze the land acquisition process and its compliance with Law Number 2 of 2012 Regarding Land Acquisition for Public Interest. The research method uses a normative legal approach with analysis of laws and regulations, interviews, and document studies. The results of the study show weaknesses in transparency and stakeholder involvement in the land acquisition process. Problematic land ownership status hinders compensation negotiations. In conclusion, the land acquisition process is not optimal and requires system improvements to ensure legal compliance, efficiency, and fairness. Improvements in procedures and transparency are urgently needed to prevent similar obstacles in future infrastructure projects.
Collaboration network of the authors
No co-authors found in Melola yet.
Metadata source: OAI-PMH (metadata jurnal) https://journal.unnes.ac.id/journals/lsr/oai, first harvested 6 Nov 2026, last seen 22 Nov 2026.
Original metadata (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
<dc:title xml:lang="en">Land Acquisition Regarding Agency Land: Construction Of The Bawen-Jogja Toll Road On SMKN 1 Bawen Agricultural Land</dc:title>
<dc:creator xml:lang="en">Anjhany, Lintar</dc:creator>
<dc:subject xml:lang="en">land acquisition</dc:subject>
<dc:subject xml:lang="en">toll road</dc:subject>
<dc:subject xml:lang="en">SMK Negeri 1 Bawen</dc:subject>
<dc:subject xml:lang="en">legal certainty</dc:subject>
<dc:subject xml:lang="en">government agency land</dc:subject>
<dc:description xml:lang="en">The construction of the Bawen-Jogja Toll Road has caused problems in the acquisition of agricultural land of SMK Negeri 1 Bawen covering an area of 1,752 m2, which is constrained by land ownership status. The complicated administrative process slows down the settlement of compensation. The purpose of this article is to analyze the land acquisition process and its compliance with Law Number 2 of 2012 Regarding Land Acquisition for Public Interest. The research method uses a normative legal approach with analysis of laws and regulations, interviews, and document studies. The results of the study show weaknesses in transparency and stakeholder involvement in the land acquisition process. Problematic land ownership status hinders compensation negotiations. In conclusion, the land acquisition process is not optimal and requires system improvements to ensure legal compliance, efficiency, and fairness. Improvements in procedures and transparency are urgently needed to prevent similar obstacles in future infrastructure projects.</dc:description>
<dc:publisher xml:lang="en">Faculty of Law, Universitas Negeri Semarang</dc:publisher>
<dc:date>2025-07-21</dc:date>
<dc:type>info:eu-repo/semantics/article</dc:type>
<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
<dc:format>application/pdf</dc:format>
<dc:identifier>https://journal.unnes.ac.id/journals/lsr/article/view/26221</dc:identifier>
<dc:identifier>10.15294/lsr.v5i2.26221</dc:identifier>
<dc:source xml:lang="en">Semarang State University Undergraduate Law and Society Review; Vol. 5 No. 2 (2025): July-December, 2025; 1638-1659</dc:source>
<dc:source>2807-8683</dc:source>
<dc:source>2807-8225</dc:source>
<dc:source>10.15294/lsr.v5i2</dc:source>
<dc:language>eng</dc:language>
<dc:relation>https://journal.unnes.ac.id/journals/lsr/article/view/26221/5196</dc:relation>
<dc:rights xml:lang="en">Copyright (c) 2025 Semarang State University Undergraduate Law and Society Review</dc:rights>
</oai_dc:dc>
Citations and indexing
OpenAlex
Indexed
via DOI
0 citations
Crossref
Indexed
via DOI
0 citations
Counts as reported by each index on 13 Nov 2026; indexes count citations differently.
OpenAlex also lists this work in: crossref, doaj.
Cite this article
APA 7
Anjhany, L. (2025). Land Acquisition Regarding Agency Land: Construction Of The Bawen-Jogja Toll Road On SMKN 1 Bawen Agricultural Land. Semarang State University Undergraduate Law and Society Review, 5(2), 1638–1659. https://doi.org/10.15294/lsr.v5i2.26221
Copy
IEEE
L. Anjhany, “Land Acquisition Regarding Agency Land: Construction Of The Bawen-Jogja Toll Road On SMKN 1 Bawen Agricultural Land,” Semarang State University Undergraduate Law and Society Review, vol. 5, no. 2, pp. 1638–1659, 2025, doi: 10.15294/lsr.v5i2.26221.
Copy
Generated from the journal's metadata; check author names before use.