Abstract

Information System is a system that is needed by organizations in evaluating the performance of a project. In EPC projects, tools are needed to help evaluate costs and progress. For this reason, through the Project Control Information System (SIPP), the prognosis of costs and project progress can be known. This study uses a mix method that aims to analyze the performance of SIPP in the Sorong Open Access project by comparing the Financial Work Plan (RKK) report with data inputted in the SIPP system and interview methods to users, direct supervisors and upper management. So that a conclusion and recommendations can be produced for improving data input and the use of SIPP in EPC projects. The results of quantitative research that have been carried out on the percentage of suitability of cost item data and RKK progress items inputted in the SIPP in December 2022, January 2023 and February 2023 the conformity value is still small. The results of qualitative research from interviews of 12 people represented by 5 users, 4 user superiors and 3 upper management, concluded that the SIPP program was quite good. However, improvements are needed in the data verification process after input. The proposed new business process is expected to improve the data input process and the conformity of the input data is 100%. So that payment problems to suppliers and progress do not experience obstacles due to data discrepancies in SIPP.

Collaboration network of the authors

2 authors · 1 co-authorship link

Hover or tap a name to highlight its co-authors. Double-click to open the author's page.

  • University of Indonesia
  • Different organisations
  • Same organisation
  • Affiliation unknown
  • Thicker line = more joint articles · bigger circle = more articles
Show as table
Co-authorOrganisationJoint articles

Affiliations come from OpenAlex; journal OAI-PMH metadata carries none. Authors without an OpenAlex ID are matched by name, which can merge or split people.

Metadata source: OAI-PMH (metadata jurnal) https://journal.unnes.ac.id/sju/index.php/maj/oai, first harvested 6 Nov 2026, last seen 6 Nov 2026.
Original metadata (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/  http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
	<dc:title xml:lang="en-US">Analysis of the Implementation of Project Control Information System (SIPP) in Engineering Procurement Construction Projects</dc:title>
	<dc:creator>Iryanto, Rudi</dc:creator>
	<dc:creator>Arviansyah, Arviansyah</dc:creator>
	<dc:description xml:lang="en-US">Information System is a system that is needed by organizations in evaluating the performance of a project. In EPC projects, tools are needed to help evaluate costs and progress. For this reason, through the Project Control Information System (SIPP), the prognosis of costs and project progress can be known. This study uses a mix method that aims to analyze the performance of SIPP in the Sorong Open Access project by comparing the Financial Work Plan (RKK) report with data inputted in the SIPP system and interview methods to users, direct supervisors and upper management. So that a conclusion and recommendations can be produced for improving data input and the use of SIPP in EPC projects. The results of quantitative research that have been carried out on the percentage of suitability of cost item data and RKK progress items inputted in the SIPP in December 2022, January 2023 and February 2023 the conformity value is still small. The results of qualitative research from interviews of 12 people represented by 5 users, 4 user superiors and 3 upper management, concluded that the SIPP program was quite good. However, improvements are needed in the data verification process after input. The proposed new business process is expected to improve the data input process and the conformity of the input data is 100%. So that payment problems to suppliers and progress do not experience obstacles due to data discrepancies in SIPP.</dc:description>
	<dc:publisher xml:lang="en-US">Universitas Negeri Semarang</dc:publisher>
	<dc:date>2023-10-01</dc:date>
	<dc:type>info:eu-repo/semantics/article</dc:type>
	<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
	<dc:type xml:lang="en-US">Peer-reviewed Article</dc:type>
	<dc:format>application/pdf</dc:format>
	<dc:identifier>https://journal.unnes.ac.id/sju/maj/article/view/70073</dc:identifier>
	<dc:identifier>10.15294/maj.v12i3.70073</dc:identifier>
	<dc:source xml:lang="en-US">Management Analysis Journal; Vol 12 No 3 (2023): Management Analysis Journal; 290-302</dc:source>
	<dc:source>2502-1451</dc:source>
	<dc:source>2252-6552</dc:source>
	<dc:source>10.15294/maj.v12i3</dc:source>
	<dc:language>eng</dc:language>
	<dc:relation>https://journal.unnes.ac.id/sju/maj/article/view/70073/25547</dc:relation>
	<dc:rights xml:lang="en-US">Copyright (c) 2023 Management Analysis Journal</dc:rights>
</oai_dc:dc>