Melola Discovery

← Melola Discovery

Open access Journal SINTA 1

Simulation for predictive maintenance using weighted training algorithms in machine learning

International Journal of Electrical and Computer Engineering (IJECE) · Vol. 12 No. 3 (2022)

DOI
10.11591/ijece.v12i3.pp2839-2846
ISSN
2722-2578, 2088-8708
Published
2022-06-01
Publisher
Institute of Advanced Engineering and Science
License
creativecommons.org/licenses/by-sa/4.0

Abstract

In the production, the efficient employment of machines is realized as a source of industry competition and strategic planning. In the manufacturing industries, data silos are harvested, which is needful to be monitored and deployed as an operational tool, which will associate with a right decision-making for minimizing maintenance cost. However, it is complex to prioritize and decide between several results. This article utilizes a synthetic data from a factory, mines the data to filter for an insight and performs machine learning (ML) tool in artificial intelligence (AI) to strategize a decision support and schedule a plan for maintenance. Data includes machinery, category, machinery, usage statistics, acquisition, owner’s unit, location, classification, and downtime. An open-source ML software tool is used to replace the short of maintenance planning and schedule. Upon data mining three promising training algorithms for the insightful data are employed as a result their accuracy figures are obtained. Then the accuracy as weighted factors to forecast the priority in maintenance schedule is proposed. The analysis helps monitor the anticipation of new machines in order to minimize mean time between failures (MTBF), promote the continuous manufacturing and achieve production’s safety.

Collaboration network of the authors

2 authors · 1 co-authorship link

Hover or tap a name to highlight its co-authors. Double-click to open the author's page.

  • Assumption University
  • Different organisations
  • Same organisation
  • Affiliation unknown
  • Thicker line = more joint articles · bigger circle = more articles
Show as table
Co-authorOrganisationJoint articles

Affiliations come from OpenAlex; journal OAI-PMH metadata carries none. Authors without an OpenAlex ID are matched by name, which can merge or split people.

This record comes from Crossref (what the publisher deposited), because the journal's own OAI-PMH endpoint could not be harvested.

Metadata source: Crossref API (cadangan, berdasarkan ISSN) https://api.crossref.org/journals/2088-8708/works, first harvested 27 Oct 2026, last seen 22 Nov 2026.
Metadata as oai_dc, converted from Crossref
<oai_dc:dc xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/"><dc:title>Simulation for predictive maintenance using weighted training algorithms in machine learning</dc:title><dc:creator>Jittawiriyanukoon, Chanintorn</dc:creator><dc:creator>Srisarkun, Vilasinee</dc:creator><dc:description>&lt;jats:p&gt;&amp;lt;span&amp;gt;In the production, the efficient employment of machines is realized as a source of industry competition and strategic planning. In the manufacturing industries, data silos are harvested, which is needful to be monitored and deployed as an operational tool, which will associate with a right decision-making for minimizing maintenance cost. However, it is complex to prioritize and decide between several results. This article utilizes a synthetic data from a factory, mines the data to filter for an insight and performs machine learning (ML) tool in artificial intelligence (AI) to strategize a decision support and schedule a plan for maintenance. Data includes machinery, category, machinery, usage statistics, acquisition, owner’s unit, location, classification, and downtime. An open-source ML software tool is used to replace the short of maintenance planning and schedule. Upon data mining three promising training algorithms for the insightful data are employed as a result their accuracy figures are obtained. Then the accuracy as weighted factors to forecast the priority in maintenance schedule is proposed. The analysis helps monitor the anticipation of new machines in order to minimize mean time between failures (MTBF), promote the continuous manufacturing and achieve production’s safety.&amp;lt;/span&amp;gt;&lt;/jats:p&gt;</dc:description><dc:publisher>Institute of Advanced Engineering and Science</dc:publisher><dc:date>2022-06-01</dc:date><dc:type>info:eu-repo/semantics/article</dc:type><dc:format>application/pdf</dc:format><dc:identifier>https://doi.org/10.11591/ijece.v12i3.pp2839-2846</dc:identifier><dc:identifier>10.11591/ijece.v12i3.pp2839-2846</dc:identifier><dc:source>International Journal of Electrical and Computer Engineering (IJECE); Vol 12 No 3 (2022); 2839</dc:source><dc:source>2722-2578</dc:source><dc:source>2088-8708</dc:source><dc:relation>http://ijece.iaescore.com/index.php/IJECE/article/viewFile/25716/15661</dc:relation><dc:rights>http://creativecommons.org/licenses/by-sa/4.0</dc:rights></oai_dc:dc>