Melola Discovery

← Melola Discovery

Open access Jurnal SINTA 1

Feasibility of Power Control for Multi-Channel User in Inter-Femtocell Network

International Journal of Electrical and Computer Engineering (IJECE) · Vol. 6 No. 4 (2016)

DOI
10.11591/ijece.v6i4.10210
ISSN
2088-8708, 2088-8708
Published
2016-08-01
Publisher
Institute of Advanced Engineering and Science
License
creativecommons.org/licenses/by-nc-nd/4.0

Abstract

The importance of power control feasibility is closely related to the direct implementation of the system, which is related to interference between users in the femtocell network and also related to the optimal use of power transmit that can create a long-lasting battery. Implementation of the feasibility of power control in this study is focused on the centralized femtocell network with a multi-channel user. The research method in this study is based on the use of feasible solution algorithms in power control by observing the output of power vector that should be valued non-negative, which means that it can be implemented. This result indicates that all of user can reach the specified target SINR. SINR users will increase when there are additional channels for user groups. The average power of user will also decrease while increasing the amount of provided channels. The greater number of users in a user group, the less value SINR can be obtained

Collaboration network of the authors

20 authors · 41 co-authorship links · 12 across different organisations

Hover or tap a name to highlight its co-authors. Double-click to open the author's page.

  • Universitas Gadjah Mada
  • Telkom University
  • University of Technology Malaysia
  • University of Brawijaya
  • Affiliation unknown
  • Different organisations
  • Same organisation
  • Affiliation unknown
  • Thicker line = more joint articles · bigger circle = more articles
Show as table
Co-authorOrganisationJoint articles
Mohammad Yanuar HariyawanAffiliation unknown2
Eka FirmansyahUniversitas Gadjah Mada2
Fakhriy HarioUniversitas Gadjah Mada2
Adhi SusantoUniversitas Gadjah Mada2
Sevia Mahdaliza IdrusUniversity of Technology Malaysia2
Sholeh Hadi P.University of Brawijaya2
Vera SuryaniUniversitas Gadjah Mada2
Widyawan WidyawanUniversitas Gadjah Mada2
Budi SetiyantoUniversitas Gadjah Mada2
Sunarno SunarnoUniversitas Gadjah Mada2
Lasmadi LasmadiUniversitas Gadjah Mada1
Adha Imam CahyadiUniversitas Gadjah Mada1
Samiadji HerdjunantoUniversitas Gadjah Mada1
Achmad RizalTelkom University1
Hanung Adi NugrohoUniversitas Gadjah Mada1
Willy Anugrah CahyadiTelkom University1

Affiliations come from OpenAlex; journal OAI-PMH metadata carries none. Authors without an OpenAlex ID are matched by name, which can merge or split people.

This record comes from Crossref (what the publisher deposited), because the journal's own OAI-PMH endpoint could not be harvested.

Metadata source: Crossref API (cadangan, berdasarkan ISSN) https://api.crossref.org/journals/2088-8708/works, first harvested 27 Okt 2026, last seen 27 Okt 2026.
Metadata as oai_dc, converted from Crossref
<oai_dc:dc xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/"><dc:title>Feasibility of Power Control for Multi-Channel User in Inter-Femtocell Network</dc:title><dc:creator>Isnawati, Anggun Fitrian</dc:creator><dc:creator>Hidayat, Risanuri</dc:creator><dc:creator>Sulistyo, Selo</dc:creator><dc:creator>Mustika, I Wayan</dc:creator><dc:description>&lt;jats:p&gt;&amp;lt;span&amp;gt;The importance of power control feasibility is closely related to the direct implementation of the system, which is related to interference between users in the femtocell network and also related to the optimal use of power transmit that can create a long-lasting battery. Implementation of the feasibility of power control in this study is focused on the centralized femtocell network with a multi-channel user. The research method in this study is based on the use of feasible solution algorithms in power control by observing the output of power vector that should be valued non-negative, which means that it can be implemented. This result indicates that all of user can reach the specified target SINR. SINR users will increase when there are additional channels for user groups. The average power of user will also decrease while increasing the amount of provided channels. The greater number of users in a user group, the less value SINR can be obtained&amp;lt;/span&amp;gt;&lt;/jats:p&gt;</dc:description><dc:publisher>Institute of Advanced Engineering and Science</dc:publisher><dc:date>2016-08-01</dc:date><dc:type>info:eu-repo/semantics/article</dc:type><dc:format>application/pdf</dc:format><dc:identifier>https://doi.org/10.11591/ijece.v6i4.10210</dc:identifier><dc:identifier>10.11591/ijece.v6i4.10210</dc:identifier><dc:source>International Journal of Electrical and Computer Engineering (IJECE); Vol 6 No 4 (2016); 1685</dc:source><dc:source>2088-8708</dc:source><dc:source>2088-8708</dc:source><dc:relation>http://www.iaescore.com/journals/index.php/IJECE/article/viewFile/738/495</dc:relation><dc:rights>http://creativecommons.org/licenses/by-nc-nd/4.0</dc:rights></oai_dc:dc>